Help Tip the Planet grow by contributing to an article. Learn how.
Wind
From TipThePlanet
- Platte River took ownership of al assets at the Medicine Bow Wind Project site and began delivering wind energy to Fort Collins Programs in the spring of 1998. In the fall of 1999 and the summer of 2000, additional turbines were built as Estes Park Light and Power, Longmont Power and Communications and Loveland Water and Power began receiving wind energy for their individual wind power programs. Two 600 kw and seven 660 kw Vestas wind turbines operate at the site. In 2005, Platte River leased land to Clipper windpower for a 2.5 MW prototype turbine, the Clipper turbine is purchased by Platte River.
- Basic Wind Information
Using Wind to Produce Energy is Not a New Idea
Windy Site for Wind Generators
- Turbine and Site Information